PREPARING EVALUATION OF TOLL CONSTRUCTION PROJECT PLANS USING CRITICAL PATH METHOD (CPM) FOR TRANS SUMATERA TOLL SECTION
Main Article Content
Yusuf Luqman
Meilita Tryana Sembiring
Iskandarini
The rapid development of technology drives competition and efficiency in Information Technology projects. Toll road projects in Indonesia, such as the Trans Sumatra Toll Road and inner-city toll roads in Jakarta, face challenges of delays. The Critical Path Method (CPM) is used to plan and evaluate these projects for improved efficiency. Evaluation of project plans is necessary to complete pending tasks. This descriptive research utilizes Job and Activity Analysis to collect quantitative data on time, cost, and resources from construction activities on the Sumatra Toll Road. The collected data is then processed using CPM to create a schedule, identify critical paths, and evaluate float times. The research provides efficient project scheduling recommendations to complete the remaining tasks on the Sumatra Toll Road project. The study concludes that by adhering to the schedule, the project can be completed on time. Delays in previous projects were primarily caused by land acquisition issues. To prevent further schedule delays, preventive strategies and resource augmentation should be considered. In summary, this research contributes efficient project scheduling recommendations to complete the remaining tasks on the Sumatra Toll Road project.
Abdurrasyid, Luqman, Abdul Haris, dan Indrianto. 2019. Implementasi Metode PERT dan CPM pada Sistem Informasi Manajemen Proyek Pembangunan Kapal. Khazanah Informatika, vol. 5, no. 1, 2019, p. 28-36
Alaydrus A M, dan Hardjomuljadi S, 2018, Analisis faktor keterlambatan dimulainya pelaksanaan proyek konstruksi pada model kontrak rancang bangun, Jurnal Konstruksia, 10(1), pp. 95-116.
Andiyan et.al. 2020. Construction Project Evaluation Using CPM-Crashing, CPM-PERT and CCPM for Minimize Project Delays. Virtual Conference on Engineering, Science and Technology (ViCEST) 2020, Journal of Physics: Conference Series, 1933 (2021) 012096
Anggara, H. 2005. Perencanaan dan Pengendalian Proyek dengan Metode PERt-CPM: Studi Kasus Fly Over Ahmad Yani, Karawang. Journal the Winners, Vol. 6, No. 2: 155-174.
Collier, Zachary A. et.al. 2018. Scenario Analysis and PERT/CPM Applied to Strategic Investment at an Automated Container Port. ASCE-ASME J. Risk Uncertainty Eng. Syst., Part A: Civ. Eng., 2018, 4(3): 04018026
Dannyanti, E. 2010. Optimalisasi Pelaksanaan Proyek dengan Metode Pert dan CPM (Studi Kasus Twin Tower Building Pascasarjana Undip). Skripsi, FT Undip. Semarang.
Gray, C., Simanjuntak, P., Lien K.S., Mspaitella, P.F.L., Varley,R.C.G. 2007. Pengantar Evaluasi Proyek. Gramedia Pustaka Utama. Jakarta.
Handoko, T.H. 1999. Manajemen Personalia dan Sumber Daya Manusia. BPFE. Yogyakarta.
Hughes, Bob & Mike Cotterell. 2002. Software Project Management. Edisi Ke-3. McGraw-Hill. London.
Iluk, Tsalist, Ahmad Ridwan, dan Sigit Winarto. 2020. Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand Panglima Polim Kediri. JURMATEKS Vol 3 No 2 Tahun 2020, p. 163-176
Karabulut, Mertcan. 2017. Application of Monte Carlo simulation and PERT/CPM techniques in planning of construction projects: A Case Study. Periodicals of Engineering and Natural Sciences, Vol.5, No.3, December2017, pp. 408‒420
Kholil, Muhammad, Bonitasari Nurul Alfa, dan Madjumsyah Hariadi. 2018. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36). IConCEES 2017, IOP Conf. Series: Earth and Environmental Science 140 (2018) 012010
Lermen, Fernando Henrique et. al. 2016. Optimization of Times and Costs of Project of Horizontal Laminator Production using PERT/ CPM Technical. Independent Journal of Management & Production, vol. 7, no. 3, 2016, p. 833-853.
Levin, Richard I. & Kirkpatrick Charles A. 1972. Perencanaan dan Pengawasan dengan PERT dan CPM. Bhratara. Jakarta.
Maddeppungeng A, Intari D E, Oktafiani A, 2019, Studi faktor penyebab keterlambatan proyek konstruksi studi kasus proyek pembangunan 6 ruas jalan tol dalam kota Jakarta, Jurnal Konstruksia, 11(1), pp. 89-96.
Malik, Alfian. 2010. Pengantar Bisnis Jasa Pelaksana Konstruksi. ANDI Offset. Yogyakarta.
Mazlum, Mete dan Ali Fuat Guneri. 2015. CPM, PERT and Project Management With Fuzzy Logic Technique and Implementation On A Business. Procedia - Social and Behavioral Sciences 210 ( 2015 ) 348 – 357
Meredith, Jack R., & Mantel Jr, Samuel J. 2006. Project Management, A managerial Approach. Sixth Edition. John Wiley & Sons, Hoboken. New Jersey.
Muhamad, Amiruddin HI. 2013. Optimalisasi Pelaksanaan Proyek dengan Metode PERT dan CPM (Studi Kasus di Gedung SMA Negeri 1 Tidore Kepulauan, Provinsi Maluku Utara). Skripsi. Fakultas Teknik, UMY. Yogyakarta.
Munawaroh. 2003. Principle of Management Construction. Jendela Ilmu. Semarang.
Nagarajan. 2007. Project Management. New Age International Pvt. New Delhi.
Nazir, Moh. 2005. Metode Penelitian. Ghalia Indonesia. Bogor.
Prasetya, Hery & Fitri Lukiastuti. 2009. Manajemen Operasi. Media Pressindo. Yogyakarta.
Render, Barry & Jay Heizer. 2004. Manajemen Operasi. Salemba Empat. Jakarta. Render, Barry & Jay Heizer. 2005. Prinsip-prinsip Manajemen Operasi. Edisi Ketujuh. Salemba Empat. Jakarta.
Render, Barry & Jay Heizer. 2006. Operations Management. 8th Edition. Pearson Prentice-Hall Inc. New Jersey.
Ridho, M. Rizki & Syahrizal. 2014. Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode PERT dan CPM (Studi Kasus: Proyek Pembangunan Gedung Kantor Badan Pusat Statistik Kota Medan di Jl. Gaperta Medan, Sumatera Utara). Jurnal Teknik Sipil USU, Vol. 3, No. 1.
Rondinelli, A. Dennis. 1990. Proyek Pembangunan Sebagai Manajemen Terpadu: Pendekatan Adaftif terhadap Pelayanan Publik. Bumi Aksara. Jakarta.
Sahid, Dadang S.S. 2012. Implementasi Critical Path Method dan PERT Analysis pada Proyek Global Technology for Local Community. Jurnal Teknologi Informasi dan Telematika, Vol. 5: 14-22.
Schwalbe, Kathy. 2004. Information Technology Project Management. Edisi Ke-4. Course Technology, Inc. Boston.
Sinulingga, Sukaria. Metode Penelitian, Edisi 1, USU Press: Medan.
Siswanto. 2007. Operation Research Jilid II. Erlangga. Jakarta.
Soeharto, I. 1999. Manajemen Konstruksi dari Konseptual Hingga Operasional. Erlangga. Jakarta.
Subagya. 2000. Analisis Manajemen Proyek. Graha Pena. Bekasi.
Susilo, Yayuk Sundari. 2012. Analisis Pelaksanaan Proyek dengan Metode CPM dan PERT (Studi Kasus pada Proyek Pelaksanaan Main Stadium University of Riau). Jurnal Fakultas Teknik Sipil Universitas Riau: 1-16.
Taghipour, Mohammad et. al. 2020. Evaluating CCPM Method Versus CPM in Multiple Petrochemical Projects. Management, Volume 3, Issue 3, 2020 ISSN: 2617-4596, p. 1-20
Tampubolon. 2004. Pedoman Manajemen Proyek. Jilid 1. Afj Mobicons. Malang.
Taurusyanti, D. & Lesmana, M.F. 2015. Optimalisasi Penjadwalan Proyek Jembatan Girder Guna Mencapai Efektifitas Penyelesaian dengan Metode PERT dan CPM pada PT Buana Masa Metalindo. Jurnal Ilmiah Manajemen Fakultas Ekonomi, Vol. 1, No. 1 Tahun