OPTIMIZATION OF MANPOWER IN SEAMLESS PIPE THREADING MANUFACTURE BATAM
Main Article Content
Maya Engelin Manopo
Muammar Khaddafi
Indrayani
The objective of manpower optimization is to have the right number of workers with the right capabilities in the right production areas. In this research, a model was developed for optimizing manpower allocation coupling threading area. Total initial manpower allocation is 26 manpower. Improvement executed which consider to customer demand and production capability. Evaluation result indicates there is unbalance workload distribution of each manpower. Improvement planned such as balancing the work load of each manpower, machine replacement, and re-layout the production area. The implementation based on Direct Productivity formula resulted manpower saving cost about 50%, from 26 manpower to 16 manpower. Standardized work did as well as the control item in order to stabilize the improvement process. The next step is the analysis of production capability to face the increasing of customer demand. This analysis concluded that production needed additional overtime and additional work shift in order to fulfill the customer demand
Adi Wijaya, S. ., Hanum, S. ., & Khaddafi, M. . (2021). THE EFFECT OF MARKETING CHANNELS AND PACKAGING ON BUSINESS SUCCESS IN STANDARD BUSINESSES IN THE CITY OF LHOKSUMAWE: (Case Study on Internet Data Package Merchants). International Journal of Social Science, Educational, Economics, Agriculture Research, and Technology (IJSET), 1(1), 21–28. https://doi.org/10.54443/ijset.v1i1.3
Elsayed, E.A., Boucher T. O. (1994). Analysis and Control of Production System: Second edition. New Jersey: Prentice-Hall International, Inc.
D.H. Stamatis. (2011). The OEE Primer: Understanding Overall Equipment Effectiveness, Reliability, and Maintainability. New York: CRC Press - Taylor and Francis Group.
Liker, J. K., Meier, D. (2006). The Toyota Way Fieldbook: a Practical Guide for implementing Toyota’s 4Ps. New York: McGraw-Hill.
Monden, Y. (2000). Sistem Produksi Toyota: Suatu Ancangan Terpadu Untuk Penerapan Just-In-Time 2. Jakarta: PPM & Yayasan Toyota & Astra.
PT Astra Otoparts. (2008). Toyota Production System: Training & Education Center. Jakarta: Author.
Riinawati, R. (2021). The Development of Information Technology and Its Influence on the Field of Management Accounting. Journal of Financial and Tax, 1(2), 131-149.
Sinurat, M., Ilham, R. N., & Cen, C. C. (2021, February). Asetpedia. id as a Start-Up Based Technology Benchmarking Innovation for Beginning Companies in the North Sumatera Region. In International Conference on Strategic Issues of Economics, Business and, Education (ICoSIEBE 2020) (pp. 109-114). Atlantis Press.